
Original: $2.95
-70%$2.95
$0.89The Story
You?ll spend less time gritting your teeth and more time sanding when you store everything you need-sanders, sandpaper, and sanding belts-in one convenient wall-hung cabinet. The cabinet accommodates a portable belt sander and a palm-grip sander.
Measures aproximately 24in. wide, 12in. deep, and 15in. tall.
MATERIALS NOT INCLUDED; DOWNLOADABLE WOODWORKING PLAN ONLY
Description
You?ll spend less time gritting your teeth and more time sanding when you store everything you need-sanders, sandpaper, and sanding belts-in one convenient wall-hung cabinet. The cabinet accommodates a portable belt sander and a palm-grip sander.
Measures aproximately 24in. wide, 12in. deep, and 15in. tall.
MATERIALS NOT INCLUDED; DOWNLOADABLE WOODWORKING PLAN ONLY












